Solution Introduction.
casting EPT | expenditure casting/silic sol expense casting/missing wax casting |
casting substance | carbon steel, stainless metal, alloy metal and etc |
materials stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd | AISI JIS GB DIN EN AEPTE |
casting areas variety | automobile areas, EPTTry areas, marine EPT elements, door lock areas, pump valve and pipe fittings areas, toilet EPT, kitchen EPT and so on |
casting fat | 2g-70kg |
floor ending | sand blasting, stain poEPTTng, mirror poEPTTng, chrome plated, painted or as customer’s request |
machining | milling, drilling, grinding, CNC machining |
shipping time | 15daEPTTfor generating molds and samples confirming, then 25-30daEPTTfor demo order |
EPT Exhibiting
Manufacturing Process
Our Workshop
Our Screening Euipments
Our OverEPTT Exhibtion Exhibiting
FAQ
one. How numerous daEPTTit will get to deveXiHu (West EPT) Dis.Hu (West EPT) Dis. one new product?
It will take about 20daEPTTto make molds and make samples for your examining.
2. What is your frequent supply time for a bulk generation?
Generally 20-30daEPTTafter prepayment paid
three. If we do not have relevant drawings, could you make drawing for us?
Indeed, we can. Only you offer us element data about your samples, our engineer can make proper drawings for you.
four. What is typical payment phrases?
TT entire payment for molds, then samples confirmed. The 30% TT prepayment must be organized, then balance in opposition to BL duplicate.